How to do a good job in the safety inspection of the volute screw dehydrator?
Mar 06, 2023
1. Before starting the sludge dewatering machine, check its sound and light alarm device. In this way, during the operation of the equipment, once an abnormal phenomenon occurs, the signal can be received in time, so that correct judgment can be made.
2. Strictly check that the hot air of the sludge dewatering machine is an overheating alarm device, and pay attention to check all safety temperature monitors to ensure that they are all in normal operation.
3. Before the operation of the sludge dewatering machine, check the lubricating oil condition of each reducer and transmission part one by one to ensure the adequacy of the lubricating oil quantity, and adjust the tightness of each transmission belt to make it in a proper tight state.
4. For the sludge dewatering machine heat exchanger into the cold air buckle and the air outlet shield exposed by the fan, it is necessary to carefully check to prevent unqualified phenomena.
5. Check the electrical equipment of the sludge dewatering machine, the grounding protection of the motor, the safety device and the insulation to ensure the integrity of the line and the goodness of the safety insurance insulation.
6. In the use of the sludge dewatering machine, the stability of the equipment transmission device base is also within the scope of safety inspection work. Only when the equipment is installed smoothly can the long-term safe and stable operation of the equipment be guaranteed.
7. With the extension of the working time of the sludge dewatering machine, the cylinder of the equipment may also be corroded. This requires us to conduct an overall inspection of the equipment before using the sludge dewatering machine. Once corrosion is found, we must take timely measures. Corresponding repair measures to prevent the scope of corrosion from expanding.